A case study for heavy
water for coarse coal washing circuit. Cost The cost of magentite preparation and recovery system is associated with elec-tricity, maintenance and wage costs. The operation and media costs should be 8 to 10 Rupees per tonne of raw coal feed, but this cost is higher due to design defects as well as leakage of magnetite from pumps, pipes and screens.
